- SOLUTIONS
- 2008 Classes
- Project Management Training
- Strategic Operations Programs
- Process & Workflow Improvement
- Excel Tools For Contractors
- Operations & Acctg. Integration
- Customized Training Programs
- RCCA (Rapid Const. Co. Analysis)
- Emerging Contractor Development
- CCD (Const. Co. Development)
- Special Projects
- RESOURCES
- BLOG
- CONTRACTOR HEADLINES
- ABOUT
- CONTACT
- SUBSCRIBE
- CLIENT LOGIN
Richard Stockton College of New Jersey: Green Addition to the Pinelands
The Richard Stockton College expansion project is an excellent case study for how to build green in a small space while acknowledging development’s impact on its natural surroundings. Richard Stockton was originally constructed in 1973 on New Jersey’s Pinelands National Park Reserve before the land was protected. The Pinelands include over one million acres of farms, wetlands, and forest and are located in the center of the southern part of the state; the Reserve was established in 1973 by an act of Congress. Expanding Stockton’s existing site footprint would have translated into additional costs and time through the NJDEP/Pinelands permitting process. Instead, the school decided to simply build on top of its existing one-story F-Wing laboratory building.
Each of Stockton’s academic buildings (A through N) are connected in order to increase their density and were originally conceived with their impact on the Pinelands in mind; the addition on top of the F-Wing was thus consistent with that original intent. Designed by Philadelphia-based Cubellis, the 28,000-square-foot expansion includes a student center atrium, eleven classrooms, a lecture hall, two multi-level computer labs, study lounges, and faculty offices. The main design concept driving the addition was to create general academic space so the classrooms were designed to be multi-use. The addition earned LEED certification shortly after the project’s completion back in June of 2006.
Specific green design features in support of the LEED rating include solar shading to minimize heat gain, occupancy sensors for lighting, water conservation fixtures, 90 percent sustainably harvested wood, and a 27 kilowatt rooftop solar panel array, which produces 10 percent of the building’s energy requirements. Perhaps the most interesting green installation is the building’s Aquifer Thermal Energy System, or ATES, which uses water drawn from an aquifer on site. Depending on the season, chilled or heated water runs through a series of pipes throughout the building, minimizing the amount of energy necessary to cool or heat the addition.
- Tread Lightly (Facility Manager)
Related Links
Adjust Text Size
Subscribe to Contactor Headlines
Categories
-
- BIM
- Best-Practices
- Career
- Codes-Standards
- Construction-Accounting
- Construction-Books
- Construction-Equipment
- Construction-Events
- Construction-Law
- Construction-News
- Construction-Productivity
- Construction-Products
- Construction-Safety
- Construction-Technolgy
- Construction-Technology
- Construction-Training
- Construction-Workforce
- Customer-Satisfaction
- Customer-Service
- Design-Engineering
- Entrepreneurship
- Estimating
- Green-Construction
- Industry-Association
- Industry-Outlook
- Interesting
- Leadership
- Lean-Construction
- Management
- Operations
- Organizational-Change
- Outside-The-Box
- Personal-Productivity
- Process-Documentation
- Project-Delivery
- Project-Management
- Public-Works
- Risk-Insurance
- Sales-Marketing
- Strategy
- Studies-Lists
- Talent
Pre-Planning Facilitation
Improve Profitability On Your Next Project
Archives
Favorite Book 2007
The Toyota Way is my favorite book for 2007. It had so many good ideas that I could not keep up and ended up reading it again and even buying the Field Book to go along with it.
Download Elegant Solutions from Change This which provides some highlights of the Toyota Production System. Too many ideas that are applicable to contractors to even count!
Recent Posts
-
- Lean & 5S's in Construction - June 08 #35
- Intervale Green: Affordable, Sustainable, & Wired in the Bronx
- Richard Stockton College of New Jersey: Green Addition to the Pinelands
- Works stops on Olympic Stadium
- Cast stone offers a number of major advantages
- Construction deaths down to 72
- Presenting the 50+ Housing Awards of 2008
- Construction workloads fall at fastest rate in decade
- Taylor Woodrow Construction said to be for sale
- Canadian Low Rises Go Green
Management Class Series
Training Modules Specifically Designed For Contractors- Construction Documentation Overview
- Scheduling
- Project Pre-Planning Impacted Jobsite Productivity
- Production Tracking Customer Service & The Project Team
- Change Orders Talent - “People Processes”
- Profit Dynamics For Construction Contracts
- Cash Flow & The Project Team
- Priorities (Time Management For Construction)
- Construction Financial Basics
- Integrated Accounting & Operations
- Project Management Overview
- Process Documentation
- Effective Superintendent Processes
- Implementing A Project Management System
- Organizational Planning For Contractors
- Technology Systems For Contractors
- Excel for Contractors


