- SOLUTIONS
- 2008 Classes
- Project Management Training
- Strategic Operations Programs
- Process & Workflow Improvement
- Excel Tools For Contractors
- Operations & Acctg. Integration
- Customized Training Programs
- RCCA (Rapid Const. Co. Analysis)
- Emerging Contractor Development
- CCD (Const. Co. Development)
- Special Projects
- RESOURCES
- BLOG
- CONTRACTOR HEADLINES
- ABOUT
- CONTACT
- SUBSCRIBE
- CLIENT LOGIN
Navy Yard’s Perry Building to Feature Renewable Energy Pilot Program
The Brooklyn Navy Yard’s Perry Building will be home to art restoration firm SurroundArt once it opens up this summer. Interiors for the 89,000-square-foot space, which is aiming for a LEED Silver under USGBC’s Core and Shell program, were designed by Steven Kratchman Architect, while the exterior of the building is being executed by Stantec. (Check out our previous posts on the Perry Building for more details on both the project and SurroundArt.) Last week, though, Stantec announced some details on the project’s renewable energy features, which will include a photovoltaic and wind power pilot program. The firm is partnering with National Grid Energy Services in order to install a number of solar panels and wind turbines on the Perry Building’s roof. The system will- at least initially- serve just the Perry Building and be tied to its main electrical equipment. Stantec is a publicly-traded, 9000-employee, 125-office design firm that is currently engaged in a number of other renewable energy projects (including some large wind farms) across the U.S.
Other green features at the Perry Building include an efficient building envelope, waterless urinals, a graywater system, and a number of recled-content construction materials. SurroundArt will pay approximately $20 per square foot for the space. The firm will ultimately hold space across three different Navy Yard buildings and create what it calls a Museum Resource Center, subletting a portion to at least five more tenants that also provide similar art-related services, which range from temperature-controlled storage to packing, transportation, and exhibit design, fabrication, and installation.
- Stantec Bringing Solar and Wind Energy to Navy Yard (PR)
- SurroundArt Selects Steven Kratchman for Green Museum Resource Center (gbNYC)
- Navy Yard to Include Green Historical Center (gbNYC)
Related Links
Adjust Text Size
Subscribe to Contactor Headlines
Categories
-
- BIM
- Best-Practices
- Career
- Codes-Standards
- Construction-Accounting
- Construction-Books
- Construction-Equipment
- Construction-Events
- Construction-Law
- Construction-News
- Construction-Productivity
- Construction-Products
- Construction-Safety
- Construction-Technology
- Construction-Training
- Construction-Workforce
- Customer-Service
- Design-Engineering
- Entrepreneurship
- Estimating
- Green-Construction
- Industry-Association
- Industry-Outlook
- Interesting
- Leadership
- Lean-Construction
- Management
- Operations
- Organizational-Change
- Outside-The-Box
- Personal-Productivity
- Process-Documentation
- Project-Delivery
- Project-Management
- Public-Works
- Risk-Insurance
- Sales-Marketing
- Strategy
- Studies-Lists
- Talent
Pre-Planning Facilitation
Improve Profitability On Your Next Project
Archives
Favorite Book 2007
The Toyota Way is my favorite book for 2007. It had so many good ideas that I could not keep up and ended up reading it again and even buying the Field Book to go along with it.
Download Elegant Solutions from Change This which provides some highlights of the Toyota Production System. Too many ideas that are applicable to contractors to even count!
Recent Posts
-
- Construction Wrap-Up Insurance Survival Guide
- 300,000 construction jobs in danger, RICS warns
- Windows & doors to be $40 billion market by 2012
- ML: 132 North Main Street: Modern Green Controversy in East Hampton
- William Pedersen Designs Green Dog House Inspired by One Jackson Square
- Seven construction bosses on their plans to beat the downturn
- Notice Provisions in Construction Contracts
- Bargains to be had on construction equipment
- The Ugly, the Bad, & the Good: Thoughts on Greenbuild 2008
- Lean & 5 S's #40
Management Class Series
Training Modules Specifically Designed For Contractors- Construction Documentation Overview
- Scheduling
- Project Pre-Planning Impacted Jobsite Productivity
- Production Tracking Customer Service & The Project Team
- Change Orders Talent - “People Processes”
- Profit Dynamics For Construction Contracts
- Cash Flow & The Project Team
- Priorities (Time Management For Construction)
- Construction Financial Basics
- Integrated Accounting & Operations
- Project Management Overview
- Process Documentation
- Effective Superintendent Processes
- Implementing A Project Management System
- Organizational Planning For Contractors
- Technology Systems For Contractors
- Excel for Contractors


